Phalcon USA 

West Farms Mall Verizon / T-Mobile install

High Tech > Wireless

Because of the relationship between McPhee Electric and West Farms Mall, we were awarded the complete installation of T-Mobile and Verizon on the roof the mall. This included having to crane all the tools, material and equipment onto the roof before the mall would open to each day. We capitalized on our pre-fabrication shop to pre-build as much of the materials wherever possible and palletize it in kitted packages, eliminating waste and excess trash.  Everything needed to be rigged across the roof, then into position. The Verizon build included a stick built shelter on a steel load frame and a natural gas generator, plus all their antennas were hidden behind FR transparent panels to match the mall. The projects were such a success that we were just awarded the AT&T installation. 

Markets